Call us today until 07:00pm on 0203 113 2122 | or We are open tomorrow at 08:00am

Our phone lines are down at the moment due to power failure, please contact us via chat or email. Apologies for the inconvenience caused.

Our phone lines are down at the moment due to power failure, please contact us via chat or email. Apologies for the inconvenience caused.

Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed
Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed

Nuie Square L-Shaped Shower Bath 1500mm x 700mm/850mm - Right Handed

Quick Code: 2781420
Ref: PMWBS1585R
Nuie
£238.95 Inc. VAT

Special offer - available at a new lower price for a limited time

Was: £

PayPal Credit
Spread the cost with 12 monthly payments of £19.91 at 0% APR using PayPal.

In Stock

Usually delivered within 3 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

Product Features

  • Right handed bath - the showering end is on the right hand side
  • Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option
  • Supplied complete with leg set ready for installation
  • Space-saving dual purpose bath and shower enclosure in modern L-shaped design
  • Brilliant white finish to match other sanitaryware such as toilets and basins
  • Single ended design - waste positioned at one end, allowing relaxation at the other
  • High quality design and build with Acrylic construction
  • Supplied without tap holes allowing them to be drilled if required
  • Supplied with a 5 year guarantee from the manufacturer, please see manufacturer guarantee policy for more information

Important Information

  • Waste sold separately (See the You May Need)
  • Bath panels and Bath screen sold separately (See the You May Need)
Show More

Bath TypeShower Bath
Bath ShapeL-Shaped
Bath ConfigurationSingle Ended
Bath Length1498mm
Bath Width705mm - 855mm
Bath Height400mm + Legs
Bath Internal Length975mm
Bath Internal Width469-317mm
Bath Thickness4mm
Capacity200 Litre
HandedRight Handed
Waste PositionEnd
MaterialAcrylic
ColourWhite
BrandNuie
CollectionSquare
StyleModern
MarketDomestic
Weight27 Kg
EAN Barcode5056211822288
Manufacturer Part Number(s)WBS1585R
Show More

Panel Fixing Clip Instructions
Type : PDF Size : 222.96 KB
Fitting Instructions
Type : PDF Size : 165.75 KB
Guarantee Policy
Type : PDF Size : 319.11 KB
Product Datasheet
Type : PDF Size : 3.18 MB
Brochure 2024
Type : PDF Size : 36.78 MB

Required Bath Waste

Nuie Bath Waste and Overflow, Brass Plug and Ball Chain, Chrome
Nuie Bath Waste and Overflow, Brass Plug and Ball Chain, Chrome
(HAE345)
£23.95
In Stock

Required Bath Panels

Required Bath Clips

Nuie Bath Panel Clips
Nuie Bath Panel Clips
(PMBPC001)
£14.95
In Stock

Suitable Bath Screen

Write a review

How do I finance my purchase?

  1. Add the items you want to add your basket and proceed to checkout.
  2. In payment options select "Pay by Paypal Credit", you can then select the finance option which you require.
  3. You will be asked to complete a simple online application, it's quick, easy and you'll get the decision within a matter of seconds. There is NO paperwork to be posted and NO physical signature required!

Interest Free Credit Calculator

Enter the total amount you want to spend.

*Finance available on all orders over £99. Prices given representative as part of larger order.

The example below highlights the interest you will pay, if your balance isn't paid off within the 0% interest free period.

£1,200
23.9% p.a. (variable)
23.9% APR (variable)

This example above illustrates the typical cost of using PayPal Credit as a standard funding method. If you take advantage of our offers and promotions, including our 0% for 6 months offer, the interest rate that applies will be lower in many circumstances. Credit is subject to application and status

For further information on our finance partnership, please visit our finance page.

Finance Page

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

Please see our privacy policy which describes how we use your personal data.